Log in to save to my catalogue

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, construct...

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, construct...

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_crossref_primary_10_1007_s10696_021_09403_0

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

About this item

Full title

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

Author / Creator

Publisher

New York: Springer US

Journal title

Flexible services and manufacturing journal, 2022-03, Vol.34 (1), p.156-203

Language

English

Formats

Publication information

Publisher

New York: Springer US

More information

Scope and Contents

Contents

In this paper, flexible preventive maintenance (PM) activities are incorporated into two-stage assembly flow shop scheduling where
m
dedicated machines in the fabrication stage and one machine in the assembly stage. The operational status of each machine is described by a continuous variable, maintenance level. The maintenance level value is...

Alternative Titles

Full title

Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics

Authors, Artists and Contributors

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_crossref_primary_10_1007_s10696_021_09403_0

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_crossref_primary_10_1007_s10696_021_09403_0

Other Identifiers

ISSN

1936-6582

E-ISSN

1936-6590

DOI

10.1007/s10696-021-09403-0

How to access this item