Log in to save to my catalogue

Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integratin...

Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integratin...

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_crossref_primary_10_1080_00207543_2024_2390979

Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics

About this item

Full title

Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics

Publisher

London: Taylor & Francis

Journal title

International journal of production research, 2025-03, Vol.63 (5), p.1753-1778

Language

English

Formats

Publication information

Publisher

London: Taylor & Francis

More information

Scope and Contents

Contents

In real-world manufacturing systems for processing printed circuit boards (PCBs), the workshops integrating various flowline-based cells are common in large-scale enterprises. The scheduling problem within the systems is modelled as the distributed heterogeneous flowshop group scheduling problem (DHFGSP) in this study. Departing from practical requ...

Alternative Titles

Full title

Optimising distributed heterogeneous flowshop group scheduling arising from PCB mounting: integrating construction and improvement heuristics

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_crossref_primary_10_1080_00207543_2024_2390979

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_crossref_primary_10_1080_00207543_2024_2390979

Other Identifiers

ISSN

0020-7543

E-ISSN

1366-588X

DOI

10.1080/00207543.2024.2390979

How to access this item