Very fast transient overvoltage calculation and evaluation for 500‐kV gas insulated substation power...
Very fast transient overvoltage calculation and evaluation for 500‐kV gas insulated substation power substation with double circuit and long gas insulated substation busbar
About this item
Full title
Author / Creator
Fu, Runyu , Wang, Jianguo , Wang, Jianping , Zhou, Mi , Li, Cai , Zhao, Yating and Fan, Yadong
Publisher
Wiley
Journal title
Language
English
Formats
Publication information
Publisher
Wiley
More information
Scope and Contents
Contents
The operation of disconnectors in gas insulated substation (GIS) or power plant will produce very fast transient overvoltage (VFTO), which is considered to have serious harm to transformer longitudinal insulation and other high‐voltage equipment insulation. VFTO may also lead to secondary circuit failure. In this paper, the holistic modelling of 50...
Alternative Titles
Full title
Very fast transient overvoltage calculation and evaluation for 500‐kV gas insulated substation power substation with double circuit and long gas insulated substation busbar
Authors, Artists and Contributors
Author / Creator
Identifiers
Primary Identifiers
Record Identifier
TN_cdi_doaj_primary_oai_doaj_org_article_3aa1cff8df944b50bb218718d8474925
Permalink
https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_3aa1cff8df944b50bb218718d8474925
Other Identifiers
ISSN
1751-8687
E-ISSN
1751-8695
DOI
10.1049/gtd2.12680