Log in to save to my catalogue

Constructive-destructive neighbor search drives artificial bee colony algorithm for variable speed g...

Constructive-destructive neighbor search drives artificial bee colony algorithm for variable speed g...

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_91077001cb794e789c3180f1c2e5aa81

Constructive-destructive neighbor search drives artificial bee colony algorithm for variable speed green hybrid flowshop scheduling problem

About this item

Full title

Constructive-destructive neighbor search drives artificial bee colony algorithm for variable speed green hybrid flowshop scheduling problem

Publisher

London: Nature Publishing Group UK

Journal title

Scientific reports, 2025-03, Vol.15 (1), p.9671-17, Article 9671

Language

English

Formats

Publication information

Publisher

London: Nature Publishing Group UK

More information

Scope and Contents

Contents

The hybrid flowshop scheduling problem (HFSP), a typical NP-hard problem, has gained significant interest from researchers focusing on the development of solution methods. We focus on a variable speed hybrid flowshop scheduling problem. We assume that machines operate at variable speed when processing workpieces, making the problem more reflective...

Alternative Titles

Full title

Constructive-destructive neighbor search drives artificial bee colony algorithm for variable speed green hybrid flowshop scheduling problem

Authors, Artists and Contributors

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_doaj_primary_oai_doaj_org_article_91077001cb794e789c3180f1c2e5aa81

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_91077001cb794e789c3180f1c2e5aa81

Other Identifiers

ISSN

2045-2322

E-ISSN

2045-2322

DOI

10.1038/s41598-025-93582-5

How to access this item