A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterat...
A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterated Greedy Algorithm
About this item
Full title
Author / Creator
Publisher
Basel: MDPI AG
Journal title
Language
English
Formats
Publication information
Publisher
Basel: MDPI AG
Subjects
More information
Scope and Contents
Contents
As multi-factory production models are more widespread in modern manufacturing systems, a distributed blocking flowshop scheduling problem (DBFSP) is studied in which no buffer between adjacent machines and setup time constraints are considered. To address the above problem, a mixed integer linear programming (MILP) model is first constructed, and...
Alternative Titles
Full title
A Distributed Blocking Flowshop Scheduling with Setup Times Using Multi-Factory Collaboration Iterated Greedy Algorithm
Authors, Artists and Contributors
Author / Creator
Identifiers
Primary Identifiers
Record Identifier
TN_cdi_doaj_primary_oai_doaj_org_article_a6f0f8959fdc4baf80a433db45464c20
Permalink
https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_a6f0f8959fdc4baf80a433db45464c20
Other Identifiers
ISSN
2227-7390
E-ISSN
2227-7390
DOI
10.3390/math11030581