Log in to save to my catalogue

Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constra...

Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constra...

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_ceeddb14723b4b4b87c4db38d6bafda8

Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model

About this item

Full title

Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model

Publisher

Basel: MDPI AG

Journal title

Mathematics (Basel), 2024-09, Vol.12 (18), p.2912

Language

English

Formats

Publication information

Publisher

Basel: MDPI AG

More information

Scope and Contents

Contents

In order to improve quality assurance in wafer manufacturing, there are strict process requirements. Besides the well-known residency time constraints (RTCs), a dual-arm cluster tool also requires each robot arm to execute a specific set of tasks. We call such a tool an arm task-constrained dual-arm cluster tool (ATC-DACT). To do this, one of the a...

Alternative Titles

Full title

Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model

Authors, Artists and Contributors

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_doaj_primary_oai_doaj_org_article_ceeddb14723b4b4b87c4db38d6bafda8

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_ceeddb14723b4b4b87c4db38d6bafda8

Other Identifiers

ISSN

2227-7390

E-ISSN

2227-7390

DOI

10.3390/math12182912

How to access this item