Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabr...
Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints
About this item
Full title
Author / Creator
Gu, Lei , Wu, Naiqi , Qiao, Yan , Zhang, Siwei and Li, Tan
Publisher
Basel: MDPI AG
Journal title
Language
English
Formats
Publication information
Publisher
Basel: MDPI AG
Subjects
More information
Scope and Contents
Contents
To increase productivity, more sophisticated cluster tools are developed. To achieve this, one of the ways is to increase the number of spaces in a process module (PM) and the number of fingers on a robot arm as well, leading to a cluster tool with multi-space PMs and a multi-finger-arm robot. This paper discusses the scheduling problem of cluster...
Alternative Titles
Full title
Scheduling Cluster Tools with Multi-Space Process Modules and a Multi-Finger-Arm Robot in Wafer Fabrication Subject to Wafer Residency Time Constraints
Authors, Artists and Contributors
Author / Creator
Identifiers
Primary Identifiers
Record Identifier
TN_cdi_doaj_primary_oai_doaj_org_article_f8418605d38d43f9aa0bf71b8b0b50f1
Permalink
https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_doaj_primary_oai_doaj_org_article_f8418605d38d43f9aa0bf71b8b0b50f1
Other Identifiers
ISSN
2076-3417
E-ISSN
2076-3417
DOI
10.3390/app14209490