Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
About this item
Full title
Author / Creator
Publisher
Harbin: Institute of Engineering Mechanics, China Earthquake Administration
Journal title
Language
English
Formats
Publication information
Publisher
Harbin: Institute of Engineering Mechanics, China Earthquake Administration
Subjects
More information
Scope and Contents
Contents
In this paper, numerical simulation with soil-water coupling finite element-finite difference(FE-FD) analysis is conducted to investigate the settlement and the excess pore water pressure(EPWP) of a piled-raft foundation due to cyclic high-speed(speed: 300km/h) train loading. To demonstrate the performance of this numerical simulation, the settleme...
Alternative Titles
Full title
Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
Authors, Artists and Contributors
Author / Creator
Identifiers
Primary Identifiers
Record Identifier
TN_cdi_proquest_journals_1916951645
Permalink
https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_1916951645
Other Identifiers
ISSN
1671-3664
E-ISSN
1993-503X
DOI
10.1007/s11803-017-0403-z