Log in to save to my catalogue

Methodologies to uprate an overhead line. Italian TSO case study

Methodologies to uprate an overhead line. Italian TSO case study

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_2272184806

Methodologies to uprate an overhead line. Italian TSO case study

About this item

Full title

Methodologies to uprate an overhead line. Italian TSO case study

Publisher

Paris: Engineering and Scientific Research Groups

Journal title

Journal of Electrical Systems, 2013, Vol.9 (4), p.422-439

Language

English

Formats

Publication information

Publisher

Paris: Engineering and Scientific Research Groups

More information

Scope and Contents

Contents

The amount of wind power and other time-variable non-dispatchable electricity generation is rapidly increasing across the world, causing a significant change in the electrical system configuration. The existing structural asset isn't adequate to dispatch these new power that have a priority in the energy dispatching. In addiction the outage of subs...

Alternative Titles

Full title

Methodologies to uprate an overhead line. Italian TSO case study

Authors, Artists and Contributors

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_proquest_journals_2272184806

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_2272184806

Other Identifiers

E-ISSN

1112-5209

How to access this item