Log in to save to my catalogue

A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop

A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_2449949092

A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop

About this item

Full title

A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop

Author / Creator

Publisher

Cairo, Egypt: Hindawi Publishing Corporation

Journal title

Mathematical problems in engineering, 2020, Vol.2020 (2020), p.1-10

Language

English

Formats

Publication information

Publisher

Cairo, Egypt: Hindawi Publishing Corporation

More information

Scope and Contents

Contents

This paper considers an assembly scheduling problem which minimizes the total weighted tardiness. The system consists of multiple manufacturing machines in the first stage and an assembly machine in the second stage. A job is composed of multiple components, each component is manufactured on a dedicated machine in the first stage, and the assembly...

Alternative Titles

Full title

A Scheduling Problem to Minimize Total Weighted Tardiness in the Two-Stage Assembly Flowshop

Authors, Artists and Contributors

Author / Creator

Identifiers

Primary Identifiers

Record Identifier

TN_cdi_proquest_journals_2449949092

Permalink

https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_2449949092

Other Identifiers

ISSN

1024-123X

E-ISSN

1563-5147

DOI

10.1155/2020/9723439

How to access this item