Evaluation of high performance constructive heuristics for the flow shop with makespan minimization
Evaluation of high performance constructive heuristics for the flow shop with makespan minimization
About this item
Full title
Author / Creator
Publisher
London: Springer London
Journal title
Language
English
Formats
Publication information
Publisher
London: Springer London
Subjects
More information
Scope and Contents
Contents
This paper analyzes the permutation flow shop scheduling problem with makespan minimization criteria. Since the publication of the well-known NEH heuristic from Nawaz, Enscore and Ham in 1983, several constructive heuristic methods have been developed. In this paper, we proposed constructive methods that make use of the principles of the NEH heuris...
Alternative Titles
Full title
Evaluation of high performance constructive heuristics for the flow shop with makespan minimization
Authors, Artists and Contributors
Author / Creator
Identifiers
Primary Identifiers
Record Identifier
TN_cdi_proquest_journals_2490839670
Permalink
https://devfeature-collection.sl.nsw.gov.au/record/TN_cdi_proquest_journals_2490839670
Other Identifiers
ISSN
0268-3768
E-ISSN
1433-3015
DOI
10.1007/s00170-016-8484-9